Deep modernization of the control system for receiving, storing and feeding of raw materials shop
What Is Implemented:
- New shop management system
Client:
large international confectionery company
Problematics and Inquiry:
- Existing control cabinets have exhausted the possibilities for expansion
- Existence of obsolete and discontinued equipment
- Tracks from existing cabinets to field devices did not allow for cable laying without stopping production
- Overloaded cable routes
The project was complicated by the fact that the time to shut down the equipment was very limited and the customer partially lacked a documentation package for the old equipment.
Tools:
- Rockwell Automation
Economic effects:
- Uninterrupted operation of the site has been established
- Simplified site maintenance
- Cable routes were freed up and made available for the installation of new cables